Cowboy

From design to manufacturable: how Voxdale helped Cowboy fix the DFM gap on a connected e-bike

Case Overview

Voxdale embedded a team of engineers and designers inside Cowboy to close the gap between design and manufacturing — leading redesigns, solving quality and cost issues, and managing the program with Cowboy's contract manufacturer.

Sector

Consumer Electronics · E-Bike / Micromobility

Client

Cowboy, a connected e-bike company [TO CONFIRM: full company description, HQ, founding]

Product

A connected e-bike (Cowboy 3 referenced in source) [TO CONFIRM: exact model scope]

Voxdale's role

Design support: mechanical development, design-for-manufacturing (DFM), program management, redesigns, quick prototyping

Technologies

Redesigned/improved mechanical parts, DFM with the contract manufacturer, prototyping to resolve gear issues

How we worked

An outsourced team of 2–3 engineers and designers embedded in Cowboy; Voxdale led some internal Cowboy design teams

Hardest challenge

Delivering fast under very high pressure while raising quality, where quality escapes threaten a startup's cash and profitability

Case Overview

Voxdale embedded a team of engineers and designers inside Cowboy to close the gap between design and manufacturing — leading redesigns, solving quality and cost issues, and managing the program with Cowboy's contract manufacturer.

Sector

Consumer Electronics · E-Bike / Micromobility

Client

Cowboy, a connected e-bike company [TO CONFIRM: full company description, HQ, founding]

Product

A connected e-bike (Cowboy 3 referenced in source) [TO CONFIRM: exact model scope]

Voxdale's role

Design support: mechanical development, design-for-manufacturing (DFM), program management, redesigns, quick prototyping

Technologies

Redesigned/improved mechanical parts, DFM with the contract manufacturer, prototyping to resolve gear issues

How we worked

An outsourced team of 2–3 engineers and designers embedded in Cowboy; Voxdale led some internal Cowboy design teams

Hardest challenge

Delivering fast under very high pressure while raising quality, where quality escapes threaten a startup's cash and profitability

Case Overview

Voxdale embedded a team of engineers and designers inside Cowboy to close the gap between design and manufacturing — leading redesigns, solving quality and cost issues, and managing the program with Cowboy's contract manufacturer.

Sector

Consumer Electronics · E-Bike / Micromobility

Client

Cowboy, a connected e-bike company [TO CONFIRM: full company description, HQ, founding]

Product

A connected e-bike (Cowboy 3 referenced in source) [TO CONFIRM: exact model scope]

Voxdale's role

Design support: mechanical development, design-for-manufacturing (DFM), program management, redesigns, quick prototyping

Technologies

Redesigned/improved mechanical parts, DFM with the contract manufacturer, prototyping to resolve gear issues

How we worked

An outsourced team of 2–3 engineers and designers embedded in Cowboy; Voxdale led some internal Cowboy design teams

Hardest challenge

Delivering fast under very high pressure while raising quality, where quality escapes threaten a startup's cash and profitability

Executive Summary

Cowboy had designed a connected e-bike but was struggling to move it cleanly from design into manufacturing.

On the Cowboy 3, parts were failing — driving reworks, quality problems and cost overruns — the classic and dangerous gap where a design that works on paper does not manufacture reliably.

Voxdale stepped in with an embedded team of two to three engineers and designers who supported, and in places led, Cowboy's internal design work: redesigning parts, solving quality issues, and driving design-for-manufacturing with Cowboy's contract manufacturing partner.

Voxdale also handled program management and ran quick prototyping to resolve gear issues. The defining constraint throughout was pressure: results had to come fast, and at a scale-up, quality failures translate directly into cash and profitability risk.

Executive Summary

Executive Summary

Client Context

Cowboy is a connected e-bike company in the consumer-electronics / micromobility space. Its product is a connected e-bike; the source material references the Cowboy 3 specifically.

By the time Voxdale was brought in, Cowboy had already developed the e-bike as a design but was struggling with the transfer from design to design-for-manufacturing. Many parts on the Cowboy 3 were failing, producing a cycle of reworks, quality issues and cost issues.

As a scale-up, Cowboy faced these problems under acute commercial pressure — quality escapes at a startup can turn quickly into cash and profitability problems.

Client Context

Client Context

The Technical Brief

  • Close the gap between Cowboy's design and manufacturable design (DFM) with the contract manufacturing partner

  • Fix parts that were failing on the Cowboy 3

  • Reduce reworks, quality issues and cost issues

  • Provide senior engineering and design capacity that could integrate into Cowboy's own teams

  • Resolve specific gear issues via quick prototyping

  • Provide program management across the effort

The Technical Brief

The Technical Brief

The Harder, Less Obvious Part

Four pressures made this harder than a standard redesign brief:

  1. Speed under commercial pressure. The team was under very high pressure to deliver fast results — fixes could not take the time a clean-sheet process would allow.

  2. Quality as a survival issue, not a metric. At a scale-up, quality problems translate directly into cash and profitability risk, so improvements had to be real and durable, not cosmetic, while still being fast.

  3. A live product already in production. Parts were failing on a shipping product (Cowboy 3), so redesigns had to slot into an existing design and an existing manufacturing setup, not a blank canvas.

  4. Working inside someone else's organisation. Voxdale had to embed in Cowboy's teams — supporting and sometimes leading internal design groups — rather than working at arm's length.

The Harder, Less Obvious Part

The Harder, Less Obvious Part

What Voxdale Delivered

Voxdale engineered five generations of the C2K device in direct co-development with ITM's clinical research team.

Mechanical development and design-for-manufacturing. Voxdale led the mechanical development of the bike in design-for-manufacturing, working directly with Cowboy's contract manufacturing partner to make parts that could be produced reliably and at cost — the core of closing the design-to-DFM gap.

Redesigns of failing parts. Many parts on the Cowboy 3 were failing. Voxdale carried out redesigns to resolve these failures and the associated reworks, quality issues and cost issues.

Embedded engineering and design team. Voxdale outsourced a team of two to three engineers and designers to support Cowboy, solving problems and improving quality issues from inside the company. In places, Voxdale led design teams internally at Cowboy rather than only contributing individual work.

Program management. Voxdale provided program management across the engagement, coordinating the redesign and DFM work.

Quick prototyping to solve gear issues. Voxdale used quick prototyping to resolve specific gear issues on the bike.

What Voxdale Delivered

What Voxdale Delivered

How We Worked

Voxdale embedded an outsourced team directly into Cowboy rather than working purely at arm’s length:

  • Project lead — Tim — direction and coordination of the engagement.

  • Embedded engineers and designers (2–3) — redesigns, DFM, and quality problem-solving, supporting and in places leading Cowboy’s internal design teams.

The effective part was proximity and ownership: because the team worked inside Cowboy and took the lead on design in places, it could move at the speed the situation demanded and act on quality and cost problems directly

How We Worked

How We Worked

The Hardest Challenge — and How We Solved It

The challenge. Delivering fast, durable fixes to a failing, in-production design while under very high pressure — where quality problems were not just technical defects but direct threats to a scale-up’s cash and profitability.

Why it was difficult. Two pressures pulled against each other: speed (the demand for fast results) and quality/cost (fixes had to genuinely reduce failures, reworks and cost, because the commercial consequences of getting it wrong were severe). Doing this inside an existing product and an existing manufacturing relationship left little room to start over.

What would not work. A slow, clean-sheet redesign process, or arm’s-length consulting that produced recommendations rather than manufacturable parts, would not have met either the speed or the ownership the situation required.

What we changed:

  1. Embed the team inside Cowboy. Two to three engineers and designers worked from within, supporting and leading internal design teams so decisions and redesigns happened fast.

  2. Design for manufacturing with the contract manufacturer in the loop. Mechanical development was done as DFM directly with the contract manufacturer, so redesigned parts were producible, not just improved on paper.

  3. Prototype quickly to unblock. Quick prototyping was used to resolve gear issues rather than waiting on full production cycles.

The Hardest Challenge — and How We Solved It

The Hardest Challenge — and How We Solved It

Outcome

  • An embedded Voxdale team (2–3 engineers/designers) supporting and leading design work inside Cowboy

  • Mechanical redesigns and DFM delivered with Cowboy's contract manufacturing partner

  • Gear issues addressed through quick prototyping

  • Program management provided across the effort

Outcome

Outcome

What This Proves for Similar Teams

This case is for hardware scale-ups and consumer-electronics companies stuck at the design-to-manufacturing transition — where the product is designed but parts fail in production, driving reworks, quality issues and cost.

It shows Voxdale can embed senior engineers and designers into a client’s own teams, take ownership of redesigns and DFM alongside the contract manufacturer, and deliver fast under real commercial pressure.

What This Proves for Similar Teams

What This Proves for Similar Teams

Discuss your hardware design-for-manufacturing challenge with Voxdale

Voxdale embeds senior engineers and designers directly inside your team — closing DFM gaps, redesigning failing parts, and working with your contract manufacturer to deliver fast, durable fixes under real commercial pressure. Explore our Industrialisation capabilities or contact us to discuss your production quality challenge.

Share this case study

Share this case study

Continue reading

Continue reading